Lake Wilcoxson or so it was dubbed by the contractor. The rain started to come heavy after the hole for the foundation was dug. It filled with so much water that Ron had to pump it out (notice the white pipes at the back of the hole). Below is the power pole with an extension chord going all the way back to the well pump house.
No comments:
Post a Comment